Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) (No. 2) Regulations 2019
See Graph- Subject to
- Proposed negative statutory instrument
- Work Packagable Thing URL
- https://www.gov.uk/eu-withdrawal-act-2018-statutory-instruments/the-electricity-network-codes-and-guidelines-system-operation-and-connection-amendment-etc-eu-exit-no-2-regulations-2019
- Graph of orchestrated work package (6x49V0BB)
- Live | Staging
- Website display
- beta | devci
Has following business items
-
Actualized on: 08/05/2019 (Wednesday)
-
Considered by the Secondary Legislation Scrutiny Committee (SLSC)
Actualized on: 29/04/2019 (Monday)
https://publications.parliament.uk/pa/ld201719/ldselect/ldseclega/347/34703.htm -
Procedure concluded in the House of Commons and the House of Lords
Actualized on: 29/04/2019 (Monday)
-
Considered by the European Statutory Instruments Committee (ESIC)
Actualized on: 24/04/2019 (Wednesday)
https://publications.parliament.uk/pa/cm201719/cmselect/cmesic/2061/206104.htm -
Actualized on: 08/04/2019 (Monday)
https://www.gov.uk/eu-withdrawal-act-2018-statutory-instruments/the-electricity-network-codes-and-guidelines-system-operation-and-connection-amendment-etc-eu-exit-no-2-regulations-2019 -
Actualized on: 08/04/2019 (Monday)
https://publications.parliament.uk/pa/cm201719/cmvote/190409v01.html#anchor-27Laying body: Department for Business, Energy and Industrial Strategy
-
Actualized on: 08/04/2019 (Monday)
https://lordsbusiness.parliament.uk/ItemOfBusiness?itemOfBusinessId=62988§ionId=54&businessPaperDate=2019-04-10Laying body: Department for Business, Energy and Industrial Strategy
No tree shown because there are no business items or no entry steps (e.g. SI exists) have been defined.